24.10.2013 Views

Fraser River Port Authority Fee Schedule - the BIEAP and FREMP ...

Fraser River Port Authority Fee Schedule - the BIEAP and FREMP ...

Fraser River Port Authority Fee Schedule - the BIEAP and FREMP ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

RENTAL RATE SCHEDULE<br />

<strong>Fraser</strong> <strong>River</strong><br />

<strong>Port</strong> <strong>Authority</strong><br />

All rents paid to <strong>the</strong> <strong>Fraser</strong> <strong>River</strong> <strong>Port</strong> <strong>Authority</strong> are subject to a fee that equals 1% of annual rent (to a maximum of $50/year). <strong>Fee</strong>s<br />

will be put towards an Environmental Contingency Fund that addresses unresolved, historical environmental problems within <strong>the</strong><br />

<strong>Fraser</strong> <strong>River</strong> <strong>Port</strong> <strong>Authority</strong>’s jurisdiction. This fee will be added to invoices.<br />

Rent Rate Calculation/Notes<br />

UPLAND SITES Variable Rent for <strong>Port</strong> <strong>Authority</strong> Upl<strong>and</strong>s is based on independent appraisal of<br />

(lease, licence, or permit)current market value for sites in <strong>the</strong> area.<br />

WATERLOTS Variable Rent is based on 8% of Total Utility Value. (For details, see p. 16–17,<br />

(lease, licence, or permit) Information <strong>and</strong> Guidelines for Tenants.)<br />

LOG STORAGE Variable Rent is based on percentage factor relating to storage location <strong>and</strong> base<br />

(lease or permit)zonal value. (For details, see p. 15, Information <strong>and</strong> Guidelines for Tenants.)<br />

UTILITY LICENCE Variable Rent is 8% of 25% of Waterlot Utility Value. (For details, see p. 16–17,<br />

Information <strong>and</strong> Guidelines for Tenants.) Crossing area calculated by<br />

dimensions of corridor plus minimum 3m buffer on ei<strong>the</strong>r side.<br />

Applies to crossings, outfalls, overhead wires, <strong>and</strong> o<strong>the</strong>r uses made<br />

by public utilities.<br />

SITE RENTAL BY $500 minimum Rent applies to l<strong>and</strong> or waterlots rented by municipalities for public use<br />

MUNICIPALITIES <strong>and</strong> access purposes (eg. parks, public moorage). Not applicable if any<br />

on-site commercial use.<br />

SITE RENTAL Filming: $750/day Application fee also applies. See FEE SCHEDULE.<br />

FOR FILMING Prep/wrap/hold:<br />

(permit)$375/day<br />

LAY-BY MOORAGE $1 per foot/day Based on overall length of vessel.<br />

02/03<br />

Suite 500, 713 Columbia Street<br />

New Westminster, BC V3M 1B2<br />

Effective May 1, 2003


FEE SCHEDULE<br />

APPLICATION FEES<br />

<strong>Fraser</strong> <strong>River</strong><br />

<strong>Port</strong> <strong>Authority</strong><br />

Tenants <strong>and</strong> applicants are encouraged to meet with <strong>the</strong> <strong>Port</strong> <strong>Authority</strong>’s Property <strong>and</strong> Environment staff to discuss proposed projects or<br />

tenure prior to submitting an application. This may avoid delays or rejection of applications due to missing information or unacceptable<br />

environmental impacts. All application fees are nonrefundable.<br />

Type <strong>Fee</strong> Calculation/Notes Payment Due<br />

TENURE Lease: $500 Nonrefundable fee charged for Submit with application.<br />

(lease, licence, or permit) Permit: $100<br />

Licence: $500<br />

each application.<br />

WATERLOT Nonrefundable fee based on value of<br />

CONSTRUCTION proposed construction <strong>and</strong> Track to<br />

which project is designated. (For Track<br />

System, see p.11, Information <strong>and</strong><br />

Guidelines for Tenants.)<br />

02/03<br />

TRACK 1<br />

Value of Construction<br />

up to $100,000<br />

$100,000+<br />

TRACK 2<br />

Value of Construction<br />

up to $100,000<br />

$100,000+<br />

TRACK 3<br />

n/a<br />

TRACK 4<br />

n/a<br />

$100<br />

$200<br />

$200<br />

$300 + costs<br />

$2,500 + costs<br />

$5,000 + costs<br />

Suite 500, 713 Columbia Street<br />

New Westminster, BC V3M 1B2<br />

Costs cover outside legal, engineering,<br />

or o<strong>the</strong>r services required to<br />

process application.<br />

Costs cover outside legal, engineering,<br />

or o<strong>the</strong>r services required to<br />

process application.<br />

Costs cover outside legal, engineering,<br />

or o<strong>the</strong>r services required to<br />

process application.<br />

Effective May 1, 2003<br />

Applicants should meet with<br />

Environment staff prior to<br />

submitting application.<br />

Proposed projects will be<br />

designated to a Track during<br />

meeting.<br />

Submit fee with application.<br />

Applicants billed for costs<br />

when received.<br />

Continued on o<strong>the</strong>r side.


APPLICATION FEES (continued)<br />

Type <strong>Fee</strong> Calculation/Notes Payment Due<br />

UPLAND CONSTRUCTION Nonrefundable fee based on value of Submit with application.<br />

proposed construction.<br />

Applicants billed for<br />

Value of Construction $2,500 + costs Costs cover outside legal, engineering, costs when received.<br />

up to $100,000<br />

or o<strong>the</strong>r services required to process<br />

application.<br />

$100,000 + $5,000 + costs Costs cover outside legal, engineering,<br />

or o<strong>the</strong>r services required to process<br />

application.<br />

FILMING<br />

SERVICE FEES<br />

$200 Nonrefundable fee.<br />

Type <strong>Fee</strong> Calculation/Notes Payment Due<br />

SUBLEASES,<br />

ASSIGNMENTS,<br />

AMENDMENTS, <strong>and</strong><br />

MORTGAGES<br />

DEVIATION from<br />

STANDARD LEASE FORM<br />

REVIEW of ENVIRON-<br />

MENTAL TESTING/<br />

ANALYSIS<br />

RIPARIAN CONSENT FEE<br />

$200 + costs<br />

$500 + legal costs<br />

$200<br />

Nonrefundable fee.<br />

Costs cover outside legal, survey,<br />

or o<strong>the</strong>r services required to<br />

process request.<br />

Nonrefundable fee.<br />

Nonrefundable fee.<br />

Submit fee with request. If<br />

amendment requires survey,<br />

survey cost is payable by applicant<br />

when estimate received.<br />

Submit fee with request.<br />

Applicants billed for costs when<br />

received.<br />

Submit fee with testing/<br />

analysis results, prior to review.<br />

Type <strong>Fee</strong> Calculation/Notes Payment Due<br />

RIPARIAN<br />

CONSENT FEE<br />

PAYMENT OF FEES<br />

Submit with application.<br />

Market rate Includes consent for log storage. Payable at time of document<br />

execution.<br />

Payment of fees <strong>and</strong> costs must be made in cash or by cheque, <strong>and</strong> delivered in person, by mail, or by courier to<br />

<strong>the</strong> <strong>Port</strong> <strong>Authority</strong>’s office. Applications will not be processed <strong>and</strong> services not provided until payment of fees <strong>and</strong><br />

applicable costs has been received.


NOTICE<br />

Suite 500, 713 Columbia Street<br />

New Westminster, BC V3M 1B2<br />

<strong>Fraser</strong> <strong>River</strong><br />

<strong>Port</strong> <strong>Authority</strong><br />

The <strong>Fraser</strong> <strong>River</strong> <strong>Port</strong> <strong>Authority</strong> is implementing new fees for tenants <strong>and</strong> revising some of its existing rental<br />

rates. The new fees <strong>and</strong> revised rates will take effect May 1, 2003.<br />

Q. Why is <strong>the</strong> <strong>Fraser</strong> <strong>River</strong> <strong>Port</strong> <strong>Authority</strong> implementing new fees?<br />

Under <strong>the</strong> Canada Marine Act, <strong>the</strong> <strong>Fraser</strong> <strong>River</strong> <strong>Port</strong> <strong>Authority</strong> must be financially self-sufficient. It is not a taxpayer-supported<br />

organization <strong>and</strong> actually pays annual stipends to <strong>the</strong> federal government. Consequently, revenues must cover costs. Given <strong>the</strong> rise<br />

in costs, it has become necessary to implement fees to recover some of <strong>the</strong> expense of processing applications <strong>and</strong> servicing tenants.<br />

Q. Why is <strong>the</strong> <strong>Port</strong> <strong>Authority</strong> revising some of its rental rates?<br />

Some of <strong>the</strong> rental rates charged by <strong>the</strong> <strong>Port</strong> <strong>Authority</strong> have fallen behind market rates. The revisions bring <strong>the</strong>m into parity with<br />

commercially accepted rates <strong>and</strong> those charged by o<strong>the</strong>r government organizations.<br />

Q. When do I pay <strong>the</strong> new fees?<br />

This varies according to <strong>the</strong> type of fee. In general, most application fees must be paid at <strong>the</strong> same time <strong>the</strong> application is submitted to<br />

<strong>the</strong> <strong>Port</strong> <strong>Authority</strong> for processing. Service fees must be submitted before requests are processed. Detailed instructions are provided on<br />

<strong>the</strong> schedules.<br />

Q. How do I pay <strong>the</strong> fee?<br />

<strong>Fee</strong>s can be paid by cash or cheque. Credit cards are not accepted. Payments can also be made in person, delivered by courier, or sent<br />

by mail to <strong>the</strong> <strong>Port</strong> <strong>Authority</strong>’s office.<br />

Q. What are <strong>the</strong> new fees <strong>and</strong> rental rates?<br />

<strong>Fee</strong>s are detailed on <strong>the</strong> <strong>Fee</strong> <strong>Schedule</strong>. Rental rates, including those that have not changed, are provided on <strong>the</strong> Rental Rate <strong>Schedule</strong>.<br />

If you have any fur<strong>the</strong>r questions, please do not hesitate to contact Dayle Burge, Manager of <strong>the</strong> Property<br />

Department, at (604) 524-6655.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!