26.10.2013 Views

Permit for Barge Loading or Unloading from River Banks

Permit for Barge Loading or Unloading from River Banks

Permit for Barge Loading or Unloading from River Banks

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

data\<strong>f<strong>or</strong></strong>ms\ops\env_<strong>f<strong>or</strong></strong>m_barge_loading_permit_k.doc<br />

FRASER RIVER PORT AUTHORITY<br />

PERMIT FORM FOR BARGE LOADING AND UNLOADING FROM RIVER BANKS<br />

APPLICATON FOR A BARGE LOADING OR UNLOADING SHALL BE COMPLETED NOT LESS THAN<br />

72 HOURS IN ADVANCE OF THE TIME THE TRIP IS TO BE MADE<br />

PERMIT #: _____________<br />

PERMIT: $ 300.00<br />

OUR FILE:_______________ YOUR FILE: ______________ 7% GST 21.00<br />

TOTAL FEE: $ 321.00<br />

PROPONENT:<br />

ADDRESS:<br />

TELEPHONE: CELLLULAR:<br />

DATE OF OPERATION:<br />

PURPOSE: (please circle applicable activity) LOADING: UNLOADING:<br />

BARGE LOCATION:<br />

BETWEEN HOURS OF: AND<br />

VIA: TUGBOAT NAME(S):<br />

BARGE NAME & NUMBER:<br />

DESCRIPTION OF CARGO TO BE TRANSPORTED:<br />

WEIGHT:<br />

ORIGIN OF MATERIAL:<br />

DESTINATION OF MATERIAL:<br />

DATE: SIGNATURE<br />

OF PROPONENT:<br />

THIS PERMIT IS SUBJECT TO THE CONDITIONS SET FORTH ON THE REVERSE.<br />

FOR OFFICE USE ONLY<br />

PERMISSIONS, REQUIREMENTS:<br />

UPLAND PROPERTY OWNER ______________ INSPECTOR OF DYKES ______________<br />

WATERLOT LESEE _______________________ NO. OF STAND-BY TUGS ______________<br />

MUNICIPALITY ________________________ OTHER _______________


CONDITIONS TO WHICH BARGE LOADING/UNLOADING PERMIT IS SUBJECT<br />

1. THE PERMITTEE SHALL COMPLY WITH ALL GOVERNMENT AND MINICIPAL REGULATIONS. (Including all P<strong>or</strong>t Auth<strong>or</strong>ity<br />

Regulations).<br />

2. THE INFORMATION GIVEN TO OBTAIN THIS PERMISSION DOES NOT CONSTITUTE THE FILING OF ANY REPORT<br />

REQUIRED BY THE REGULATIONS.<br />

3. THE FEE FOR THIS PERMIT IS IN ADDITION TO ALL FEES PAYABLE BY THE PERMITTEE PURSUANT TO THE<br />

REGULATIONS.<br />

4. PERMITTEE:<br />

YOU DO, FOR YOUR OWN PART, HEREBY WAIVE FOR THE FUTURE AND AS REGARDS THIRD PARTIES SHALL AT ALL<br />

TIMES INDEMNIFY AND SAVE HARMLESS HER MAJASTY THE QUEEN IN RIGHT OF CANADA AND THE PORT<br />

AUTHORITY FROM AND AGAINST ANY AND ALL CLAIMS, DEMANDS, LOSSES, COSTS, RESONALBLE SOLICITOR AND<br />

OWN CLIENT FEES AND DISBURSEMENTS, DAMAGES, ACTIONS, SUITS AND OTHER PROCEEDINGS BY WHOMSOEVER<br />

MADE, BROUGHT OR PROSECUTED, IN ANY MANNER BASED UPON, OCCASIONED BY, OR ATTRIBUTABLE TO THE<br />

EXECUTION OF THIS PERMIT OR ANY ACTION TAKEN OR THING DONE OR MAINTAINED BY VIRTUE THEREOF OR<br />

OMITTED TO BE SO TAKEN OR MAINTAINED OR THE EXERCISE IN ANY MANNER OF RIGHTS ARISING HEREUNDER<br />

AND WITHOUT LIMITING THE GENERALITY OF THE FOREGOING WHETHER THE SAME SHALL ARISE IN<br />

CONSEQUENCE OF A NAVIGATIONAL ACCIDENT OR IN CONNECTION WITH THE CONSTRUCTION OF ANY WORKS OR<br />

THE USE AND OCCUPANCY OF THE LAND AND ANY WORKS THERON, AND HER MAJESTY AND/OR THE PORT<br />

AUTHORITY MAY MAKE GOOD THE SAME AND RECOVER THE COSTS THEREOF FROM YOU; SAVE AND EXCEPT TO<br />

THE PROPORTION AND EXTENT THAT ANY SUCH CLAIMS, DEMANDS, LOSSES, COSTS, RESONALBLE SOLICITOR AND<br />

CLIENT FEES AND DISBURSEMENTS, DAMAGES, ACTIONS, OTHER PROCEEDINGS ARE THE RESULT OF NEGLIGENCE<br />

OF THE PORT AUTHORITY OR HER MAJESTY AND THEIR AGENTS AND SERVANTS WHILE ACTING WITH THE SCOPE<br />

OF THEIR DUTIES OR EMPLOYMENT.<br />

5. EACH TUG REQUIRED BY THE TERMS OF THE PERMIT SHALL STAND BY THE BARGE AT ALL TIMES WHILE IT IS AT<br />

THE SITE OF LOADING OR UNLOADING.<br />

6. YOU SHALL AT YOUR OWN COST OBTAIN AND MAINTAIN IN GOOD STANDING INSURANCE IN THE SUCH AMOUNTS<br />

AND IN SUCH FORM OF POLICIES AND CONTAIN SUCH TERMS AND WITH SUCH INSURANCE COMPANY OR<br />

COMPANIES AND AGAINST SUCH RISKS, INCLUDING, BUT NOT IN ANY WAY LIMITED TO, COMPREHENSIVE GENERAL<br />

LIABILITY INSURANCE, MARINE PROTECTION AND INDEMNITY INSURANCE , AND TENANTS LEGAL LIABILITY<br />

INSURANCE AS MAY BE REQUIRED BY THE PORT AUTHORITY UPON WRITTEN NOTICE FROM TIME TO TIME, AND<br />

YOU SHALL FURNISH TO THE PORT AUTHORITY FORTHWITH UPON REQUEST CERTIFIED COPIES OF THE POLICIES<br />

AND PROOF THAT PREMIUMS FOR SUCH INSUANCE HAVE BEEN FULLY PAID. THE SAID INSURANCE SHALL ALSO<br />

PROVIDE:<br />

A. THAT THE PORT AUTHORITY BE A NAMED INSURED;<br />

B. AN ENDORSEMENT TO INCLUDE A CROSS-LIABILITY CLAUSE TO COVER CLAIMS AGAINST EACH OF THE<br />

PARTIES HERETO BY THE OTHER PARTIES HERETO; AND<br />

C. THE POLICY MAY NOT BE CANCELLED WITHOUT SIXTY (60) DAYS NOTICE TO THE PORT AUTHORITY<br />

7. THIS PERMIT IS ISSUED SUBJECT TO PROVIDING PROOF OF SUFFICIENT AMOUNTS AND TYPES OF INSURANCE TO<br />

SATISFY THESE CONCERNS.<br />

8. OTHER:<br />

data\<strong>f<strong>or</strong></strong>ms\ops\env_<strong>f<strong>or</strong></strong>m_barge_loading_permit_k.doc

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!